Case Study
The Grand Bohemian Hotel, Greenville, USA
Download PDF
Project Overview
The 187-room Grand Bohemian, developed by the Florida-based Kessler Collection faced several issues with the site that would challenge its targeted opening date. Being built in the popular downtown community of Greenville, SC, the hotel will feature 30 balcony suites, a luxury spa, restaurant, bar, and indoor and outdoor event spaces. A 1:1 slope from the base of the hotel leading down to the flood-prone Reedy River needed protection from erosion and potential shallow sliding. Any failure of the embankment could cause exposure to the rammed aggregate piers that support the hotel.
Solution
The original specification called for S8 Aluminum anchors driven to a depth of 16’. During the installation process, many previously unidentified obstructions were encountered. It was determined that the slope was filled with debris from an old textile mill. A smaller Platipus S6 Cast Iron anchor, driven to a depth of 13’, was more efficient in penetrating the varying slope conditions. To stabilize the embankment, all anchors were loaded between 4,000 to 6,000 lbs. (depending on depth) successfully securing double twist PVC coated wire mesh with erosion control matting supplied by Maccaferri – USA.