by Earth Anchors | Jul 10, 2017
Mesquite Street By-Pass Stormwater CIP Improvements – USA Project Specification The purpose of the project was to mitigate flooding in the area by improving drainage conveyance toward the Gulf of Mexico. The project required a combination of single and double...
by Earth Anchors | Jul 7, 2017
Chilton Street Culvert – UK Project Specification A culvert at Chilton Street was being replaced with a 1500mm diameter twin wall polyethylene pipe encased in lightweight concrete, as the original brick structure was showing signs of failure. Some means of...
by Earth Anchors | Jul 7, 2017
Trailwood & Chestnut – Stormwater Improvements – Desloge, MO Project Specification Improvements to the underground stormwater system under existing residential streets and sidewalks in Desloge, MO were needed to include the upgrade of a 440′...